Loleta Community Services District Water Storage Tank Replacement Project
3 Documents in Project
Summary
SCH Number
2022060639
Lead Agency
Loleta Communtiy Service District
Document Title
Loleta Community Services District Water Storage Tank Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/8/2024
Document Description
The Project includes construction of two new, steel 225,006-gallon water storage tanks to replace the existing, failing redwood storage tank. The new tanks will be installed on a parcel owned by the water district, located adjacent to US Highway 101 for easier tank maintenance access. The Project will install approximately 1,400 linear feet of new below-ground 12-inch diameter polyvinyl chloride water main to connect the new water tanks to the existing pressure distribution system. The existing redwood storage tank and all aboveground piping and appurtenances will be demolished and removed.
Contact Information
Name
Robyn Mendoza
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Address
Phone
Location
Cities
Unincorporated area
Counties
Humboldt
Regions
Unincorporated
Cross Streets
Loleta Drive, US Highway 101
Zip
95551
Total Acres
1.8
State Highways
HWY 101
Schools
Loleta Grammar School
Waterways
Eel River
Township
3N
Range
1W
Section
17
Notice of Determination
Approving Agency
State Water Resources Control Board- DFA
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Humboldt
Final Environmental Document Available at
1001 I St. 16th Floor Sacramento, CA 95814
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.