9840 Farris Lane Rezone & Tentative Parcel Map (PLNG21-022)

Summary

SCH Number
2022060571
Public Agency
City of Elk Grove
Document Title
9840 Farris Lane Rezone & Tentative Parcel Map (PLNG21-022)
Document Type
NOE - Notice of Exemption
Received
Posted
6/24/2022
Document Description
The Project consists of a Rezone to amend the zoning designation of ±6.14 gross acres from the AR-5 (Agricultural Residential – Minimum 5-Acre Lot) designation to the AR-2 (Agricultural Residential – Minimum 2-Acre Lot) designation and a Tentative Parcel Map to subdivide two existing parcels into three new parcels: Parcel 1 (±2.04 acres); Parcel 2 (±2.04 acres); and Parcel 3 (±2.06 acres). Each parcel will have access off Farris Lane through a proposed 25-foot wide private road. Any future home construction will be required to comply with the City’s Climate Action Plan (CAP) measures for new single family.

Contact Information

Name
Joseph Daguman
Agency Name
City of Elk Grove
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Regions
Citywide
Parcel #
127-0070-022 & 127-0070-026

Notice of Exemption

Exempt Status
Other
Type, Section or Code
Consistent With a Community Plan or Zoning [Section 15183(a)]
Reasons for Exemption
The proposed Project is consistent with the development density established by the General Plan EIR because the parcel split will result in new parcels over two acres in size at a density consistent with the rural area range of 0.1 to 0.5 units per acre. The Project does not include the conversion of qualified agricultural or projected farmland and, therefore, does not require mitigation. While there is no physical construction proposed with this Project, buildout consistent with the EGMC would likely result in the development of one, new single-family residential unit on each of the newly created lots. Any future construction on the Project site shall comply with EGMC development standards for land grading and erosion control (Chapter 16.44), tree protection (Chapter 19.12), Swainson’s hawk surveys and possible mitigation (Chapter 16.130), in addition to other pre-construction surveys as defined by the General Plan EIR.
County Clerk
Sacramento

Attachments

Notice of Exemption

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print