Interstate 10/Rock Slope Protection Project (1J470) (Streambed Alteration Agreement No. EPIMSRIV-37489-R6)

6 Documents in Project

Summary

SCH Number
2022060556
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
Interstate 10/Rock Slope Protection Project (1J470) (Streambed Alteration Agreement No. EPIMSRIV-37489-R6)
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2023
Document Description
The California Department of Fish and Wildlife (CDFW) has amended Lake and Streambed Alteration Agreement (EPIMS- RIV-37489-R6), pursuant to Fish and Game Code section 1602, the project Applicant, California Department of Transportation (Caltrans). The Project is located within the existing Caltrans right-of-way and will repair the existing rock slope protection. Project activities include the removal of vegetation from the bed, bank and channel of Determination and Three-Star Ditches, removal of existing degraded riprap from the channel banks, and installation of partially grouted riprap.

Contact Information

Name
Jason Bil
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Riverside
Regions
Southern California
Other Location Info
Location at the Determination Ditch (PostMile (PM) 90.9) and Three-Star Ditch (PM 87.9) Bridges on the east and west bound lanes of the I-10 in the Chuckwalla Valley, between the community of Chiriaco Summit and Red Cloud Mine Road.

Notice of Determination

Approving Agency
Fish and Wildlife, Region 6
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
California Department of Transportation 464 West 4th Street San Bernardino, CA 92401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print