Twin Lakes Battery Energy Storage System Project (Streambed Alteration Agreement No. EPIMSMOO-28137-R6)

Summary

SCH Number
2022060542
Public Agency
California Department of Fish and Wildlife, Inland Deserts Region 6 (CDFW)
Document Title
Twin Lakes Battery Energy Storage System Project (Streambed Alteration Agreement No. EPIMSMOO-28137-R6)
Document Type
NOE - Notice of Exemption
Received
Posted
6/24/2022
Document Description
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement number EPIMS-MOO-28137-R6, pursuant to Section 1602 of the Fish and Game Code to Southern California Edison as represented by Hazem Gabr. The project is limited to installing a Battery Energy Storage System (BESS), including ancillary equipment, within an infill lot. The project includes trenching, grading, and the installation of a concrete foundation to support the battery placement, storage area, enclosed switches, and conductors. A perimeter wall will also be installed around the BESS facility. Access improvements for the BESS will involve culverting of a roadside ditch. A maximum of 26 linear feet of 24-inch reinforced concrete culvert (with a flared end section) will be placed into the roadside stream, connected to an existing downstream culvert, and filled (with native fill), compacted, and contoured to street grade to support the BESS ingress/egress access point into the battery facility after project completion. A separate laydown area for equipment and materials storage will be used during the construction of the project. The laydown area is composed of an abandoned parking lot/loading area.

Contact Information

Name
Marina Barton
Agency Name
Fish and Wildlife, Region 6
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Counties
Mono
Regions
Southern California

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Categorical Exemption. Class 3 § 15303 (d), New Construction and Conversion of Smaller Structures
Reasons for Exemption
Class 3 consists of construction and location of limited numbers of new, small facilities or structures and installation of small new equipment and facilities in small structures such as electrical, gas, and other utility extensions of reasonable length to serve such construction. The project is limited to installing a Battery Energy Storage System to improve the reliability of SCE’s Highland Electrical Grid. The project does not involve any further alteration of the existing facility or expansion of existing or former use.
County Clerk
Mono

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print