Hemet 30

3 Documents in Project

Summary

SCH Number
2022060297
Lead Agency
Riverside County
Document Title
Hemet 30
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2022
Document Description
The 30-acre Project site is located in the County of Riverside California on the U.S Geological Survey (USGS) Map Winchester topographic map within Section 14 of Township 5 South, Range 2 West. The Project Site is located south of Highway 74 and west of Joel Drive. The Applicant proposes to construct a residential community consisting of 144 detached single-family dwellings (Project), park area, a water quality/detention basin, a temporary channel fronting the Project site for offsite flows, and expansion of Highway 74. Approvals include Zone Change from W-2 to R-4, Approval of a Tentative Tract Map No. 37737, Plot Plan No. 210143. Areas surrounding the Project Site include Highway 74 to the north, vacant land to the east and west, except the southeast corner of the Project site that abuts to existing single family residential; and rural housing to the south.

Contact Information

Name
Deborah Bradford
Agency Name
Riverside County
Job Title
Project Planner
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated
Counties
Riverside
Regions
Countywide
Cross Streets
Highway 74 and Joel Drive
Zip
92545
Total Acres
28.58
Parcel #
465-040-025, -026, and -027
State Highways
74
Waterways
San Diego Canal
Township
5S
Range
2W
Section
14
Base
BLM

Notice of Determination

Approving Agency
Riverside County
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
Riverside County Planning Department, 4080 Lemon Street, 12th floor, Riverside, CA 92501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print