Pressure Zone 538 Reservoir Replacement Project

2 Documents in Project

Summary

SCH Number
2022060263
Lead Agency
Ventura County
Document Title
Pressure Zone 538 Reservoir Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2024
Document Description
The proposed project consists of the removal of the existing 210,000-gallon Pressure Zone 538 Reservoir and replacement with two 300,000 gallon above-ground tanks within the existing easement. The proposed project would be constructed in three phases: • Phase 1. Construction of the common tank pad and Tank 1 to serve the Somis Ranch Farmworker Housing Project. • Phase 2. Construction of the booster pump station. • Phase 3. Construction of Tank 2 to serve existing Waterworks District No. 19 customers. The purpose of the project is to increase the storage capacity for the 538 Pressure Zone and provide storage capacity to serve the Somis Ranch Farmworker Housing Project to be constructed at 2789 Somis Road in Somis.

Contact Information

Name
Adrian Dela Calzada
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Ryan Lippincott
Agency Name
Ventura County Public Works Water & Sanitation
Job Title
Project Manager
Contact Types
Lead/Public Agency

Location

Cities
Camarillo
Counties
Ventura
Regions
Southern California
Cross Streets
Worth Way/Castillo de Rosas
Zip
93066
Total Acres
0.4
Parcel #
163-0-010-27
State Highways
SR 118, SR 34
Railways
Metrolink, Union Pacific
Waterways
Arroyo Las Posas
Township
3N
Range
20W
Base
San Bern

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Ventura
Final Environmental Document Available at
1180 Eugenia Place, Suite 200, Carpinteria, CA 93013

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print