03-3H610 Monte Vista Pavement Rehabilitation

5 Documents in Project

Summary

SCH Number
2022060245
Lead Agency
California Department of Transportation, District 3 (DOT)
Document Title
03-3H610 Monte Vista Pavement Rehabilitation
Document Type
NOD - Notice of Determination
Received
Posted
8/25/2022
Document Description
The California Department of Transportation (Caltrans) proposes to improve the safety, reliability, and freight mobility of this mountain segment on Interstate 80 (I-80) in Placer County, from post mile 42.7 to 49.3. Proposed improvements will reduce traffic delays and improve overall traffic operations. The project will preserve and extend the useful life of the existing pavement in the eastbound direction, by cold plaining, which removes the surface of the existing pavement and overlaying onto the existing pavement. This project will also address drainage systems that are nearing the end of their service life by installing, extending, or replacing culverts, address inadequate roadside lighting, upgrade non-standard median barrier, improve the Traffic Management System (TMS) in the EB direction, and address wildlife crossing conflicts.

Contact Information

Name
Tracy Robinson
Agency Name
Department of Transportation
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Colfax
Counties
Placer
Regions
Northern California
State Highways
Interstate 80 in Placer County
Other Location Info
Project is located between 0.45 Miles West of Monte Vista Overcrossing and 0.3 Miles East of Drum Forebay Overcrossing

Notice of Determination

Approving Agency
Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print