Jasmine Solar Project by SF Jasmine, LLC

4 Documents in Project

Summary

SCH Number
2022060193
Lead Agency
Kern County
Document Title
Jasmine Solar Project by SF Jasmine, LLC
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2024
Document Description
The Jasmine Solar Project, as proposed by SF Jasmine, LLC would construct and operate a photovoltaic solar facility and associated infrastructure necessary to generate up to 70 megawatts(MW) of renewable energy and a Battery Energy Storage System (BESS) capable of storing approximately 65MW to provide approximately 260megawatt hours (MWh) of energy, on approximately 493 acres of privately-owned land. The project site consists of 1 site located on 1 privately owned parcel. The project study area consists of an approximate total of 527 acres and includes the project solar facility and transmission line areas. The project would be supported by a 230-kilovolt (kV) gen-tie overhead and/or underground electrical transmission line(s) originating from one or more on-site substations and terminating at a nearby Substation. The project’s permanent facilities would include, but are not limited to, service roads, a power collection system, inverter stations, transformer systems, transmission lines, electrical switchyards, project substations, energy (battery) storage system, and operations and maintenance facilities.

Contact Information

Name
Terrance Smalls
Agency Name
Kern County Planning and Natural Resources Department
Job Title
Supervising Planner
Contact Types
Lead/Public Agency

Location

Cities
Unincorporated Area
Counties
Kern
Regions
Unincorporated
Cross Streets
C
Total Acres
527
Jobs
500
Parcel #
Multiple
State Highways
SR166
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
N/A
Township
32S
Range
27E
Section
31
Base
MDB&M

Notice of Determination

Approving Agency
Kern County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
https://kernplanning.com/environmental-doc/jasmine-solar-project/

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print