Sites Reservoir 2022-2024 Geotechnical Investigations Project

4 Documents in Project

Summary

SCH Number
2022050480
Lead Agency
Site Project Authority (SPA)
Document Title
Sites Reservoir 2022-2024 Geotechnical Investigations Project
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2022
Document Description
To support the engineering and design of the proposed Sites Reservoir Project, types of geotechnical studies are proposed: • Surface geological investigations conducted via pedestrian surveys to map the existing geology of the region. • Surface geophysical investigations to include non-invasive species surveys to determination stratification properties. • Subsurface geotechnical investigations, including underground exploration utilizing several methods including auger and rotary wash borings with downhole testing and rock coring. Project activities consist of four geotechnical investigations within aquatic resources. Geotechnical investigations would result in the excavation or discharge of fill material within jurisdictional waters. Geotechnical investigations within aquatic resources at Funks Reservoir will be conducted in dry conditions. Work activities are scheduled for late January 2023 or January 2024, depending on precipitation event occurrence. An existing seasonal wetland where impacts will occur is typically dry during the summer months. Therefore, work is planned between June and September 2022 in this aquatic feature.

Contact Information

Name
Sara Gevorgyan
Agency Name
Central Valley Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Colusa, Glenn, Yolo
Regions
Northern California
Other Location Info
Latitude: 39°18’32.47”,Longitude: -122°20’17.30”

Notice of Determination

Approving Agency
Central Valley Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerks
Colusa, Glenn, Yolo
Final Environmental Document Available at
https://ceqanet.opr.ca.gov/2022050480/2

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print