EA 10-1J820 SR 12 – Valley Oaks Intersection Improvement (Streambed Alteration Agreement EPIMS Notification No. CAL-45796-R2)

5 Documents in Project

Summary

SCH Number
2022050385
Lead Agency
California Department of Fish and Wildlife, North Central Region 2 (CDFW)
Document Title
EA 10-1J820 SR 12 – Valley Oaks Intersection Improvement (Streambed Alteration Agreement EPIMS Notification No. CAL-45796-R2)
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2024
Document Description
The project is limited to the installation of a flared end section (FES), temporary access and fill placement within Cosgrove Creek on the south side of SR 12. No in-water work will be required as construction activity will occur while the drainage is dry. A variety of earthmoving equipment such as excavators, backhoes, and hand or vehicle mounted auger will do most of the earthmoving work within the site. Water trucks, service trucks, and other typical construction vehicles will be present. Access to the site/staging area will occur via SR 12. The larger project being constructed includes road widening including turn signals and bike paths, electrical conduit installation, and newly installed traffic signals.

Contact Information

Name
Irina Lopatin
Agency Name
California Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Calaveras
Regions
Northern California
Waterways
Cosgrove Creek, a tributary to the lower Calaveras River
Other Location Info
Valley Springs, California on State Route (SR) 12, between Post Miles 10.1 and 10.3

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Calaveras
Final Environmental Document Available at
available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print