Poso Creek Phase III Underground Injection Control Project 566-09-021

7 Documents in Project

Summary

SCH Number
2022050215
Lead Agency
California Department of Conservation (DOC)
Document Title
Poso Creek Phase III Underground Injection Control Project 566-09-021
Document Type
NOD - Notice of Determination
Received
Posted
10/6/2022
Document Description
E&B Natural Resources Management Corporation (E&B) has applied to the Department of Conservation, Geologic Energy Management Division (CalGEM) to amend two existing Class II Underground Injection Control (UIC) Project Approval Letter (PAL) to merge their steam flood and cyclic steam production activities at the Poso Creek Oil Field. The proposed Project consists of 62 new wells, on the proposed sites within three surface lease areas (federal and private lands), for a total disturbance equal to 60 acres as part of the third phase of expansion of existing operations in the Poso Creek Oil Field (Phase III). The proposed project area under Phase III would be geographically contiguous to previously approved project areas (Phase I approved in 2013 and Phase II approved in 2018). All previously approved injection activity under Phase I and Phase II expansion will be covered by the amended PAL.

Contact Information

Name
Ray Mullins
Agency Name
California Department of Conservation
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Location

Counties
Kern
Regions
Southern California
Township
27S
Range
27E
Section
Sec 32

Notice of Determination

Approving Agency
DOC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print