Camino Del Mar Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2022050089
Lead Agency
City of Del Mar
Document Title
Camino Del Mar Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/5/2024
Document Description
The Project activity entails the removal and replacement of an existing bridge (No. 57C-0209) with a new bridge as well as the north and south existing connections to the Camino Del Mar roadway. The new bridge design consists of a five-span cast-in-place pre-stressed concrete box girder bridge that would be slightly longer, wider, and higher than the existing bridge.

Contact Information

Name
Alan Monji
Agency Name
Regional Water Quality Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Del Mar
Counties
San Diego
Regions
Citywide
Cross Streets
Via de la Valle
Zip
92014
Total Acres
10.5
State Highways
INTERSTATE 5
Railways
San Diego Rail Corridor
Waterways
San Dieguito Lagoon
Township
14S
Range
4 west
Section
11
Other Location Info
Project is located over San Dieguito Lagoon mouth and replaces the existing vehicle and pedestrian bridge.

Notice of Determination

Approving Agency
Regional Water Quality Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
City of Del Mar, 1050 Camino Del Mar, CA, 92014, contact Amanda Lee

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print