NASSCO Floating Dry Dock Replacement and Waterfront Improvement Project

5 Documents in Project

Summary

SCH Number
2022040595
Lead Agency
San Diego Unified Port District
Document Title
NASSCO Floating Dry Dock Replacement and Waterfront Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/13/2023
Document Description
The project is the repair, maintenance, and replacement of the following existing in-water facilities used for repair of military and other vessels: removal and replacement of the existing floating dry dock and supporting infrastructure, improvements to the repair complex wharf, repairs to the quay wall and revetments, and as-needed structural repair or replacement of selected piles. There would be no increase in operational capacity at the project site following completion of the proposed project.

Contact Information

Name
Scott Vurbeff
Agency Name
San Diego Unified Port District
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Regions
Citywide, Countywide
Cross Streets
Harbor Drive and S 28th Street
Zip
92113
State Highways
Interstate 5
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
https://pantheonstorage.blob.core.windows.net/ceqa/NASSCO-FEIR-Vol-1-Web-Sept5th.pdf https://pantheonstorage.blob.core.windows.net/ceqa/NASSCO-FEIR-Vol-2-Appendices.pdf

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print