PG&E L-130 Sacramento River Crossing Pipeline Replacement Project

4 Documents in Project

Summary

SCH Number
2022040570
Lead Agency
California State Lands Commission (SLC)
Document Title
PG&E L-130 Sacramento River Crossing Pipeline Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/24/2022
Document Description
The Project would install a new 16-inch-diameter pipeline underneath the Sacramento River using horizontal directional drilling (HDD) techniques, tie the new crossing into the existing pipeline network, and then decommission the existing Sacramento River crossing. The Project would be conducted in two distinct but sequential phases: 1) replacement pipeline installation and 2) decommissioning of the existing L-130 pipeline crossing. The State Lands Commission action is an amendment of a 20-year General Lease – Right-of-Way Use through December 31, 2031.

Contact Information

Name
Alexandra Borack
Agency Name
CA State Lands Commission
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Rio Vista
Counties
Sacramento, Solano
Regions
Northern California
Cross Streets
Beach Drive and Montezuma Hills Road
Zip
94571
Total Acres
33.72
Parcel #
004-932-0060, 157-0110-058-0000, 157-0110-029-0000, 157-0110-032-0000
State Highways
12, 160
Schools
Riverview Middle School, Rio Vista High School
Waterways
Sacramento River, Tomato Slough
Township
4N
Range
3E
Section
31
Base
MDM

Notice of Determination

Approving Agency
CA State Lands Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print