American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River Erosion Contract 2

5 Documents in Project

Summary

SCH Number
2022040317
Lead Agency
Central Valley Flood Protection Board
Document Title
American River Watershed Common Features, Water Resources Development Act of 2016 Project (ARCF 2016), Sacramento River Erosion Contract 2
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2022
Document Description
The proposed project consists of approximately 14,950 linear feet of bank protection and approximately 3 acres of planting benches along the Sacramento River east levee. The Sacramento River Erosion Contract 2 is the second contract on the Sacramento River and is anticipated to be constructed in 2023 and 2024 to address longstanding erosion concerns along the Sacramento River east levee.

Contact Information

Name
Susanna Real
Agency Name
Central Valley Flood Protection Board
Job Title
Environmental Scientist
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Northern California
Other Location Info
The project is located in the City and County of Sacramento, California, along the left bank (when facing downstream) of the Sacramento River. The proposed project includes Sacramento River erosion protection work near Miller Park and in the Little Pocket and Pocket-Greenhaven neighborhoods.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print