Timber Harvest Plan 1-21-00037 SON “North Miller Ridge” (Streambed Alteration Agreement No. 1600-2021-0009-R3)
Summary
SCH Number
2022040287
Lead Agency
California Department of Forestry and Fire Protection
(CAL FIRE)
Document Title
Timber Harvest Plan 1-21-00037 SON “North Miller Ridge” (Streambed Alteration Agreement No. 1600-2021-0009-R3)
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2022
Document Description
The project is limited to the replacement of 11 culverts, removal of 9 culverts, installation of 15 rock armored fills/fords, removal of 2 bridges, conducting crossing
maintenance at 17 locations, water drafting at 5 locations, and restoration activities at a legacy instream landing.
Contact Information
Name
Barry Miller
Agency Name
Department of Fish and Wildlife : Bay Delta Region
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Counties
Sonoma
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at unnamed tributaries to the Wheatfield Fork Gualala
River, in the County of Sonoma, State of California; Section 5, Township 9N, Range 13W; and Sections 30, 31, and 32, Township 10N, Range 13W, U.S. Geological Survey (USGS) map Annapolis, Mt. Diablo base and meridian.
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Sonoma
Final Environmental Document Available at
is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as Responsible Agency is available at
CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.