State Route 247 Pavement Rehabilitation and Shoulder Widening Project

7 Documents in Project

Summary

SCH Number
2022040204
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
State Route 247 Pavement Rehabilitation and Shoulder Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2023
Document Description
The California Department of Transportation (Caltrans) proposes to extend the life of the existing pavement and improve ride quality along State Route 247 from State Route 62 to 0.4 miles north of Gin Road in San Bernardino County. The scope of work consists of cold plane and overlay, shoulder widening to current standards, culvert and drainage repairs and improvements, re-grading the roadway, constructing rock slope protection, and installing bicycle lane markings and signs. The State Lands Commission action is to authorize, acting as trustee of the School Land Bank Fund, the sale and subsequent issuance of a patent to Caltrans, for 6.99-acres, more or less, of indemnity school lands located along State Highway 247.

Contact Information

Name
Sarah Mongano
Agency Name
CSLC
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Lucerne Valley
Counties
San Bernardino
Regions
Southern California
Other Location Info
School lands located along State Highway 247 in Sections 3, 4, and 10, Township 3 North, Range 4 East, SBM, east of the community of Lucerne Valley, San Bernardino County

Notice of Determination

Approving Agency
CSLC
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print