San Pablo Police Headquarters and Training Facility

3 Documents in Project

Summary

SCH Number
2022040121
Lead Agency
City of San Pablo
Document Title
San Pablo Police Headquarters and Training Facility
Document Type
NOD - Notice of Determination
Received
Posted
4/6/2022
Document Description
*Note please see link for prior submission https://ceqanet.opr.ca.gov/2008082069/3* The project activities involve construction and operation of a Police Headquarters and Training Facility (Project) on a 2.3-acre portion of a site known as Block “F” which was previously approved for high-density mixed-use development. The Project will be delivered through a design-build process and is projected to consist of a two-story building of approximately 42,000 square feet. The City of San Pablo utilized information and analysis in the 2030 San Pablo General Plan environmental impact report (EIR) to support a final determination about the type of environmental document required to be prepared for the San Pablo Police Headquarters and Training Facility as provided by Sections 15162, 15163, and 15164 of the California Environmental Quality Act (CEQA) Guidelines, which was determined to be an Addendum. The EIR was adopted by the City of San Pablo on September 19, 2011. The EIR evaluated the potential environmental effects of developing the Block “F” site, and the project will be consistent with the overall assumptions for development on the Block “F” site as presented in the General Plan.

Contact Information

Name
Michelle Chavez
Agency Name
City of San Pablo
Job Title
Administrative Secretary
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
San Pablo
Counties
Contra Costa
Regions
Citywide, Northern California, San Francisco Bay Area
Cross Streets
Gateway Avenue and Chattleton Lane
Zip
94806
Total Acres
2.3

Notice of Determination

Approving Agency
City of San Pablo
Approving Agency Role
Lead Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
https://www.sanpabloca.gov/2705/California-Environmental-Quality-Act

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print