Marin County State Route 37 Capital Preventive Maintenance (CAPM) Pavement Project

3 Documents in Project

Summary

SCH Number
2022040025
Lead Agency
California Department of Transportation, District 4 (DOT)
Document Title
Marin County State Route 37 Capital Preventive Maintenance (CAPM) Pavement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/13/2022
Document Description
The Project is located in Marin County, California on State Route 37 from ramp 11.2 to post mile 14.6. The Project includes resurfacing and repairing the existing asphalt-concrete pavement; injecting polyurethane foam below the roadway to address settlement correction; replacing traffic loop detectors, and asphalt-concrete dikes; upgrading concrete barriers, guard rails, and curb ramps; installing enhanced wet/night visibility striping; adjusting and cleaning drain inlets; and providing vegetation control under guardrails and thrie-beam barriers. The Project would have no impact on agriculture and forest resources, cultural resources, land use and planning, mineral resources, population and housing, public services, recreation, and tribal cultural resources. The Project would have less than significant impacts on aesthetics, agriculture and forest resources, air quality, biological resources, cultural resources, energy, geology and soils, greenhouse gas emissions, hazards and hazardous waste, hydrology and water quality, noise, transportation and traffic, utilities and service systems, and wildfire.

Contact Information

Name
Arnica MacCarthy
Agency Name
California Department of Transportation, District 4
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency / Project Applicant / Parties Undertaking Project

Location

Counties
Marin
Regions
Countywide, San Francisco Bay Area
Cross Streets
State Route 37
State Highways
Ramp 11.2 to post mile 14.6

Notice of Determination

Approving Agency
California Department of Transportation, District 4
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print