Bacon Island Levee Rehabilitation Project (Streambed Alteration Agreement No. EPIMS-SJN-23093- R3

3 Documents in Project

Summary

SCH Number
2022030744
Lead Agency
Bacon Island Reclamation District 2028
Document Title
Bacon Island Levee Rehabilitation Project (Streambed Alteration Agreement No. EPIMS-SJN-23093- R3
Document Type
NOD - Notice of Determination
Received
Posted
12/30/2022
Document Description
The project is limited to the north and south sides of Bacon Island’s levee system (Connection Slough and Santa Fe Cut), approximately 3.5 miles in length total, to sustainably achieve the minimum requirements of the Bulletin 192- 82 standard. Levee rehabilitation consists of widening and raising the levee crest, armoring the raised portion of the levee crest, flattening the landside levee slope, and placing an all-weather surface on the finished levee crest. Soil fill material may be sourced from within Bacon Island (on-site borrow) or as import from regional off-site commercial locations. Existing levee encroachments or penetrations within the levee such as siphon pipes, drainpipes, and unused structures or remnants of structures may be removed or relocated to facilitate the levee rehabilitation. Pipes within the borrow site will be avoided.

Contact Information

Name
Christina Autry
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Unincorporated Area
Counties
San Joaquin
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at Connection Slough and Santa Fe Cut on Old River, in the County of San Joaquin, State of California; Latitude 37.941111, Longitude -121.547583.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
2825 Cordelia Road, Suite 100, Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.