Bacon Island Levee Rehabilitation Project

3 Documents in Project

Summary

SCH Number
2022030744
Lead Agency
Bacon Island Reclamation District 2028
Document Title
Bacon Island Levee Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2022
Document Description
Reclamation District No. 2028 plans to rehabilitate the north and south sides of Bacon Island’s levee system (Connection Slough and Santa Fe Cut), approximately 3.5 miles in length total, to sustainably achieve the minimum requirements of Bulletin 192-82 standard. Levee rehabilitation consists of widening and raising the levee crest, armoring the raised portion of the levee crest, flattening the landside levee slope, and placing an all-weather surface on the finished levee crest. Soil fill material may be sourced from within Bacon Island (on-site borrow) or as import from regional off-site commercial locations. Existing levee encroachments or penetrations such as siphon pipes, drain pipes, and unused structures or remnants of structures may be removed or relocated to facilitate the levee rehabilitation.

Contact Information

Name
Brian Janowiak
Agency Name
District Engineer
Job Title
District Engineer
Contact Types
Parties Undertaking Project

Name
Michael Nishimura
Agency Name
District Engineer
Job Title
District Engineer
Contact Types
Parties Undertaking Project

Name
David Forkel
Agency Name
District Trustee
Job Title
District Trustee
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Regions
Countywide, Statewide
Cross Streets
S. Bacon Island Road and Bacon Island Road
Zip
95219
Total Acres
65.43
Jobs
20
Parcel #
129-005-001, 129-005-003, 129-005-027, 129-005-016, 129-005-015, 129-005-014
State Highways
HWY 4
Railways
BNSF Railway
Airports
N/A
Schools
N/A
Waterways
Connection Slough and Santa Fe Cut
Township
2N
Range
4E
Section
20-22
Base
M.D.B.M

Notice of Determination

Approving Agency
Reclamation District No. 3
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
455 University Ave, Suite 100, Sacramento, CA, 95825

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print