City of Sacramento Groundwater Master Plan & Well Replacement Program

3 Documents in Project

Summary

SCH Number
2022030709
Lead Agency
City of Sacramento
Document Title
City of Sacramento Groundwater Master Plan & Well Replacement Program
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2024
Document Description
The project consists of the replacement of 38 groundwater wells and associated facilities throughout the City of Sacramento that are at or near the end of their useful life. Due to climate change, extremely dry years are expected to be more frequent and intense, and maintaining the City's capability to extract groundwater more reliably will allow the City to diversify its water supply portfolio. The program is an outgrowth of the City's Groundwater Master Plan and identifies where, when, and how certain municipal production wells should be replaced, given current economic, regulatory and water quality constraints as well as variations in hydrologic and climate conditions affecting reliability of the City's surface water supply. Replacement planning was found to be necessary because many of the current well locations are too small to accommodate same-site well replacement, and groundwater quality concerns may affect the ability to use many of the City's existing wells. As such, new locations are required for most replacement wells. The Project includes initial exploratory drilling, construction, operation, and long-term maintenance of 38 wells, including above-ground wellhead facilities, such as pumps and a chlorination/ fluoridation system, as well as below ground sanitary sewer and drinking water distribution system connections. Replacement wells would be constructed to produce approximately 1,250 gallons per minute of groundwater when in full operation. Wells in areas with groundwater quality concerns would require the construction and operation of necessary treatment systems. The Project also includes destruction of the 38 existing City wells and would take place after the replacement well is fully operational.

Contact Information

Name
Kathy Sananikone
Agency Name
City of Sacramento Department of Utilities
Job Title
Project Engineer
Contact Types
Project Applicant

Name
Scott Johnson
Agency Name
City of Sacramento - Lead Agency Contact
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Regions
Citywide
Cross Streets
Citywide

Notice of Determination

Approving Agency
City of Sacramento - City Council
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
City of Sacramento, Office of the City Clerk 915 I Street, Sacramento, California 95814 https://www.cityofsacramento.gov/clerk/records-management

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print