Water Supply Improvement Project

3 Documents in Project

Summary

SCH Number
2022030580
Lead Agency
Lamont Public Utility District
Document Title
Water Supply Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2022
Document Description
The project being considered at this time is the drilling, testing, and equipping of four new wells at the locations identified above, and the extension of a water line to the EAPOA and installation of a loop distribution system within the EAPOA property boundary. The LPUD will drill the test wells using a casing hammer drilling method at two locations – Well 11 and Well 12 replacement sites. The test well will be drilled to an appropriate depth of 900 feet with systematic tests to determine an actual production zone of groundwater without substantial contamination. Assuming adequate water quality meeting drinking water standards, a production well will be constructed with continued water quality monitoring. Once drilled, each well will be equipped with vertical turbine pumps, motor discharge piping, electrical and controls, and connections installed to the existing distribution system. If needed, well head treatment may be added to one or more of the wells. The LPUD will install a supervisory control and data acquisition (SCADA) system for remote monitoring and control of the District facilities. To supply the EAPOA project area, a 10-inch diameter water transmission line will be installed within the existing disturbed road right-of-way of Di Giorogio Road. This will encompass installing approximately 11,000 feet of pipeline in this alignment. At the intersection of Di Giorgio Road and Alderwood Street an 8 inch diameter water distribution line will connect into the 10-inch transmission line and a new looped distribution line will be installed within the residential area. This new water line will be approximately 20,000 feet in length. In conjunction with replacement of the existing EAPOA water system the following actions will be completed: properly abandon EAPOA Wells 1 and 2; demolish the existing EAPOA 25,000- and 44,000-gallon water storage tanks (steel storage tanks); demolish and remove existing booster pump stations at Well 1 and 2; and install water meters at the existing 81 water connections. It is assumed there will be no increase in water demand within Lamont and the EAPOA project area. The LPUD will have to pump more water (estimated to be 205 gpm during peak hour), but from an aquifer-wide standpoint this increase in water production will be offset by closure/abandon-ment of the two EAPOA wells currently used to supply the EAPOA residents with potable water.

Contact Information

Name
Scott Taylor
Agency Name
Lamont Public Utility District
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Regions
Countywide
Cross Streets
SE of downtown Bakersfield
Total Acres
~4 acres
Parcel #
various
State Highways
184
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
N/A
Township
31S
Range
28&29E
Base
MDB&M
Other Location Info
Well Sites: Sections 1-3 &9-12, Township 31 South, Range 28 East, MDB&M Sections 6&7, Township 31 South, Range 29 East, MDB&M Consolidation of EAPOA: Section 10, Township 31 South, Range 28 East, MDB&M

Notice of Determination

Approving Agency
Lamont Public Utility District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Kern
Final Environmental Document Available at
Lamont Public Utility District, 8624 Segrue Road, Lamont, CA 92341

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.