River Path Del Mar Phase III Extension Project
3 Documents in Project
Summary
SCH Number
2022030141
Lead Agency
City of Del Mar
Document Title
River Path Del Mar Phase III Extension Project
Document Type
FIN - Final Document
Received
Document Description
The proposed project involves the Phase III extension of the River Path Del Mar (River Path) pedestrian trail in the City of Del Mar (City) along the southern edge of the San Dieguito Lagoon (lagoon). Phases I and II are completed, with Phase I extending northwest of Jimmy Durante Boulevard and Phase II extending southeast of Jimmy Durante Boulevard. Combined, the River Path is generally oriented in a northwest to southeast direction along the lagoon between the railroad tracks near Camino Del Mar and the Lagoon Viewpoint at the Old Grand Avenue Bridge (Grand Avenue Lookout). The River Path provides views of the water and includes informational signage regarding the importance of wetlands and natural resources. The proposed project would complete the River Path by extending the trail southeast of the Grand Avenue Lookout for approximately one-half mile until termination at the City limits near the Crest Canyon Trail. Completion of a formal trail segment that would link the Coast to Crest Trail to the Crest Canyon Trail has been a long-time goal of the City, the City’s Lagoon Committee, the San Dieguito River Valley Conservancy (SDRVC or Conservancy), and the San Dieguito River Valley Regional Open Space Park Joint Powers Authority (San Dieguito River Park JPA). In May 2016, the Phase II River Path section between Jimmy Durante Boulevard and Grand Avenue Lookout opened to the public and a future Phase III extension continuing the River Path to the Crest Canyon Trail was immediately envisioned. In partnership with the Conservancy and the San Dieguito River Park JPA, the City would manage this project from initial design through construction. Construction is anticipated to begin in 2023 for a duration of approximately four months. Following construction of the project, the City would oversee perpetual management of the Phase III extension of the River Path in conjunction with Phases I and II.
Contact Information
Name
Adriana Jarmishian
Agency Name
City of Del Mar
Job Title
Planner
Contact Types
Lead/Public Agency / Project Applicant
Phone
Location
Coordinates
Cities
Del Mar
Counties
San Diego
Regions
Southern California
Cross Streets
camino del mar
Zip
92014
Total Acres
0.29
State Highways
I-5
Railways
california coaster
Schools
del mar hills elementary
Waterways
san dieguito lagoon
Notice of Completion
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Conservation (DOC), California Department of Fish and Wildlife, Marin Region 7 (CDFW), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Office of Historic Preservation, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Quality
Development Types
Recreational (River Path)
Local Actions
Use Permit, Coastal Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Attachments
Final Document(s) [Approved_Certified draft environmental documents]
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.