Minor Pavement Rehabilitation (CAPM) on 1-40 Between Interstate 15/Interstate 40 Separation and 0.4 Miles East of Lava Wash Bridge

5 Documents in Project

Summary

SCH Number
2022030006
Lead Agency
California Department of Transportation, District 8 (DOT)
Document Title
Minor Pavement Rehabilitation (CAPM) on 1-40 Between Interstate 15/Interstate 40 Separation and 0.4 Miles East of Lava Wash Bridge
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2022
Document Description
The project consists of milling and overlaying the existing pavement, digging out localized pavement failures, rehabilitating sign panels and lighting, and replacing rock slope protection. Additional work includes upgrading Americans with Disabilities Act (ADA) curb ramps and upgrading highway appurtenances to improve roadside safety, such as replace existing Guardrail with Midwest Guardrail System, including Alternate Inline System, replace and install Shoulders and Centerline Rumble Strips

Contact Information

Name
Gabrielle Duff
Agency Name
California Department of Transportation
Job Title
Senior Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Barstow
Counties
San Bernardino
Regions
Southern California
Cross Streets
I-40 PM S0.0/S0.8; 0.0/R15.0/Main St.
Zip
92311
State Highways
I-40
Railways
BNSF Railway
Airports
Barstow-Daggett Airport
Schools
Excelsior Charter School
Waterways
Mohave River

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
464 West 4th Street, San Bernardino, CA 92401

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print