USE PERMIT APPLICATION NO. PLN2021-0111 – BELTRAN SOLAR ENERGY CENTER

3 Documents in Project

Summary

SCH Number
2022020479
Lead Agency
Stanislaus County
Document Title
USE PERMIT APPLICATION NO. PLN2021-0111 – BELTRAN SOLAR ENERGY CENTER
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Irrigated farmland, unirrigated rangeland / General Agriculture (A-2-40/A-2-160) / Agriculture
Document Description
Request to amend Use Permit No. 2011-11 – Beltran Ranch Solar Farm, which was approved by the Stanislaus County Planning Commission on April 18, 2013 to construct a utility-grade 140 megawatt (MW) solar facility comprised of three phases on 606± acres of a 1,720± acre project site. A Mitigated Negative Declaration (MND) was prepared and adopted in conjunction with the approved project. A Time Extension, granting the applicant an additional five years to construct, was approved by the Planning Commission on February 15, 2018. Staff Approvals may be requested in accordance with Section 21.100 – Staff Approvals which allows up to 25% increase of a use approved by Use Permit; however, the current request is an expansion of the approved facility by more than 25% which requires a new Use Permit. The proposed modifications will remain within the project footprint approved in 2013, on land regularly disturbed in conjunction with on-site crops and crop rotation, with the exception of a proposed 400-foot-wide 24.5 kilovolt (kV) collector line, which will be located outside of the original project site in order to connect to a substation located on the Proxima Solar Energy Center, approved by Staff Approval Permit No. PLN2020-0061. The 2013 project identified three phases totaling 606 acres (113, 167, and 326 acres approved for each phase respectively) within the 1,720-acre project site to be developed over the course of three to four years. To date, none of the phases have been developed. The applicant is proposing to develop the project in a single phase within an 18-month construction schedule and expand the overall development footprint by up to 211± acres depending on the chosen collector line alignment, from 606 acres to 817± acres, to be contained within the overall project area originally analyzed in the 2013 MND.

Contact Information

Name
Kristen Anaya
Agency Name
Stanislaus County Planning and Community Development
Job Title
Assistant Planner
Contact Types
Lead/Public Agency

Location

Cities
Crows Landing, Newman
Counties
Stanislaus
Regions
Citywide, Countywide
Cross Streets
1-5, Davis Road
Zip
95360
Total Acres
1720
Parcel #
See IS
State Highways
I-5
Airports
Crows Landing
Waterways
Crow Creek, California Aqueduct, Delta Mendota Canal
Township
See IS
Range
See IS
Section
See IS
Base
MDB&M
Other Information
See IS

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 10 (DOT), California Department of Transportation, Division of Aeronautics (DOT), California Department of Transportation, Division of Transportation Planning (DOT), California Department of Water Resources (DWR), California Energy Commission, California Governor's Office of Emergency Services (OES), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Central Valley Flood Protection Board, Delta Stewardship Council, Department of Toxic Substances Control, State Water Resources Control Board, Division of Drinking Water, State Water Resources Control Board, Division of Water Rights, California Department of Fish and Wildlife, Central Region 4 (CDFW)
State Reviewing Agency Comments
California Department of Fish and Wildlife, Central Region 4 (CDFW)
Development Types
Power:Solar (Megawatts 300)
Local Actions
Use Permit
Project Issues
N/A
Local Review Period Start
Local Review Period End

Attachments

Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Completion [NOC] Transmittal form
State Comment Letters [Comments from state reviewing agencies]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print