10-0X740 Calaveras County Bridge Replacement

7 Documents in Project

Summary

SCH Number
2022020409
Lead Agency
California Department of Transportation, District 10 (DOT)
Document Title
10-0X740 Calaveras County Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
8/9/2022
Document Description
The California Department of Transportation (Caltrans) proposes to replace the North Fork Calaveras River Bridge on an alternate alignment along State Route 12 in Calaveras County. The current bridge has above-average collision rates and nonstandard bridge railings, width, superelevation, and horizontal alignment. The proposed replacement bridge will have two 12-foot lanes, two 8-foot shoulders, and new bridge railings to meet current standards. The project will also involve roadway realignment next to the north side of the existing bridge and will correct the existing nonstandard horizontal roadway alignment at the west and east ends of the structure.

Contact Information

Name
Jaycee Azevedo
Agency Name
California Department of Transportation
Job Title
Environmental Branch Chief
Contact Types
Lead/Public Agency

Location

Cities
Angels Camp
Counties
Calaveras
Regions
Countywide, Northern California
State Highways
State Route 12

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
County Clerk
Calaveras
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-10/district-10-current-projects/10-0x740

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print