Merced Pavement Anchor Project

4 Documents in Project

Summary

SCH Number
2022020408
Lead Agency
California Department of Transportation, District 10 (DOT)
Document Title
Merced Pavement Anchor Project
Document Type
NOD - Notice of Determination
Received
Posted
5/27/2022
Document Description
The California Department of Transportation (Caltrans) proposes to perform roadway improvements along State Route 59 between post mile R0.0 and post mile R12.1 in Merced County. The existing pavement has deteriorated, resulting in poor ride quality and requiring elevated maintenance efforts. A cold plane and overlay strategy will be used to preserve the pavement. The scope of work for the project will include repairing and replacing the existing pavement and replacing identified damaged culverts and end treatments. There are four bridges within the project area. Three of the bridges—Owens Creek Bridge, Miles Creek Bridge, and Deadman Creek Bridge— will require barrier and block extensions, replacement of existing metal beam guardrails to the Midwest Guardrail System, and replacement of nonstandard end treatments and terminal systems. The fourth bridge, Mariposa Creek Bridge, will be removed and replaced with a higher bridge to eliminate the continuous flooding that occurs at this location. Caltrans

Contact Information

Name
Scott Guidi
Agency Name
Dept. of Transportation- Caltrans
Job Title
Branch Chief
Contact Types
Lead/Public Agency

Location

Cities
Merced
Counties
Merced
Regions
Countywide, Unincorporated
Cross Streets
na
State Highways
59
Railways
n/a
Airports
n/a
Schools
El Nido
Waterways
Mariposa Creek, Owens Creek, Miles Creek, and Deadman Creek

Notice of Determination

Approving Agency
Dept. of Transportation- Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print