Slater Avenue Mixed-Use Project

4 Documents in Project

Summary

SCH Number
2022020139
Lead Agency
City of Fountain Valley
Document Title
Slater Avenue Mixed-Use Project
Document Type
MND - Mitigated Negative Declaration
Received
Document Description
The proposed project would demolish the existing three buildings, pavement, and infrastructure on the project site, and construct one (1) four- and five-story building structure that would include 270 residential units (including 33 affordable housing units), a restaurant with 5,000 square feet of indoor dining space and 2,000 square feet of outdoor dining space and a walkup coffee and lunch bar, a 1,660-square-foot art gallery, a parking garage, and amenities. The project includes installation of new water, sewer, and stormwater drainage infrastructure that would connect to existing infrastructure adjacent to the site. The project includes a Development Code Amendment to create a new mixed-use zone, a General Plan Amendment to change the Land Use designation of the site from General Commercial (up to 0.50 FAR) to a new land use designation of Mixed Use 1 (MU-1). The project also includes a Zoning Change to change the zoning of the site from Local Business (C-1 – 0.5 FAR) to Mixed Use (MU-1). The proposed project would result in a gross density of 81 dwelling units per acre (du/ac) after density bonus for provision of affordable housing. A Precise Plan of Design is proposed for the building structure and site improvements.

Contact Information

Name
Steven Ayers
Agency Name
City of Fountain Valley, Planning and Building Department
Job Title
Principal Planner
Contact Types
Lead/Public Agency

Location

Cities
Fountain Valley
Counties
Orange
Regions
Citywide
Cross Streets
Slater Avenue and San Mateo Street
Zip
92708
Total Acres
3.34
Parcel #
169-122-02, -07, -08
State Highways
I-405
Railways
None
Airports
None
Schools
Masuda Middle School
Waterways
Santa Ana River
Township
5S
Range
10W
Section
29
Base
SBBM

Notice of Completion

Development Types
Residential (Units 270, Acres 3.34), Office (Sq. Ft. 8660, Acres 3.34, Employees 26)
Local Actions
General Plan Amendment, Rezone
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Energy, Flood Plain/Flooding, Geology/Soils, Greenhouse Gas Emissions, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mandatory Findings of Significance, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Tribal Cultural Resources, Utilities/Service Systems, Vegetation, Wetland/Riparian, Wildfire
Local Review Period Start
Local Review Period End

Attachments

Download CSV Download All Attachments New Search Print