Line A Stormdrain and Bledsoe Gulch Outfall Reconstruction

2 Documents in Project

Summary

SCH Number
2022020105
Lead Agency
City of Highland
Document Title
Line A Stormdrain and Bledsoe Gulch Outfall Reconstruction
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2022
Document Description
The City proposes to: replace the underground Line A storm drain facilities situated between the EHR clubhouse and the nearby Bledsoe Gulch, to which Line A outlets; replace the storm drain outfall facilities in Bledsoe Gulch; regrade Bledsoe Gulch sideslopes in the vicinity of the Line A new outfall which is severely eroded and threatening homes; construct new maintenance access road over the reconstructed stormdrain. The approximately 300 feet of the existing 48-inch RCP will be replaced with new 48-inch RCP within the same alignment but at approximately 10 feet deeper than the existing line to promote positive flow given the severely eroded creek head, base, and sideslopes and to reduce creek erosion.

Contact Information

Name
Kim Stater
Agency Name
City of Highland
Job Title
Assistant Community Development Director
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Highland
Counties
San Bernardino
Regions
Southern California
Cross Streets
Highland Ave and Rockspring Lane
Zip
92346
Total Acres
0.45
Jobs
1
Parcel #
0288-251-83
State Highways
None
Railways
None
Airports
None
Schools
None
Waterways
Bledsoe Creek
Township
1N
Range
3W
Section
35
Base
SBBM
Other Location Info
Behind the East Highlands Ranch Community Center

Notice of Determination

Approving Agency
City of Highland
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
City of Highland - Public Works Department, 27215 Base Line St, Highland, CA 92346

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print