Aries Fairfield Bioprocessing Project

2 Documents in Project

Summary

SCH Number
2022020070
Lead Agency
Fairfield Suisun Sewer District
Document Title
Aries Fairfield Bioprocessing Project
Document Type
NOD - Notice of Determination
Received
Posted
7/19/2022
Document Description
The Fairfield-Suisun Sewer District (FSSD) proposes to execute a lease agreement with Aries Fairfield LLC, who proposes the construction and operation of a biomass processing facility located on approximately 2.5 acres of a 7-acre leased site within the existing FSSD Wastewater Treatment Plant (WWTP). The Project would be suitable for processing and converting a variety of biomass streams (e.g., biosolids from the District or other wastewater treatment plants in the area and woody biomass from local industrial or municipal producers/aggregators), diverting these biomass streams from landfills, and converting them into usable renewable thermal energy, renewable electrical energy, and carbon products (that have beneficial uses in building, manufacturing, industrial, and agricultural material inputs and also can sequester carbon).

Contact Information

Name
Talyon Sortor
Agency Name
Fairfield-Suisun Sewer District
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
Fairfield, Suisun City
Counties
Solano
Regions
Citywide, Countywide
Cross Streets
Chadbourne Road and Cordelia Road
Zip
94534
State Highways
State Route 12
Railways
UPRR
Waterways
Boynton Slough

Notice of Determination

Approving Agency
Fairfield-Suisun Sewer District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
1010 Chadbourne Road, Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print