Streambed Alteration Agreement No. 1600-2021-0029-R2 (“Big Grizzly” Timber Harvesting Plan 2-21-00155-PLA, Sierra Pacific Industries)

Summary

SCH Number
2022010518
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2021-0029-R2 (“Big Grizzly” Timber Harvesting Plan 2-21-00155-PLA, Sierra Pacific Industries)
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2022
Document Description
The eleven watercourse crossings and water drafting projects are limited to installing a temporary bridge, constructing and maintaining water drafting sites, installing a corrugated metal pipe, constructing a “rocked burrito”, and creating a rocked ford. Further explanation of work can be referenced within the THP 2-21-00155-PLA.

Contact Information

Name
Carlee Cockrum
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
Placer
Regions
Northern California
Other Location Info
The projects are located within the boundaries of a timber harvesting plan in Placer County, within CALWATER watersheds Wallace Canyon, Long Canyon, Big Grizzly Canyon, Little Grizzly Canyon, and Zero Spring and their connecting tributaries; Township 13N, Range 12E, Sections 15 and 25 and Township 13N, Range 13E, Sections 17, 20, and 29 of the U.S. Geological Survey (USGS) 7.5-minute Quad Map, Devil Peak and Tunnel Hill, Mount Diablo Base and Meridian.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print