Wireless Telecommunications Facilities Ordinance and Design Guidelines

2 Documents in Project

Summary

SCH Number
2022010517
Lead Agency
City of Los Altos
Document Title
Wireless Telecommunications Facilities Ordinance and Design Guidelines
Document Type
NOD - Notice of Determination
Received
Posted
6/17/2022
Document Description
The proposed project involves revisions to the City of Los Altos' existing standards for development of wireless telecommunications facilities, including an ordinance to regulate permissible locations and preferences for the location of wireless facilities. These locational standards, which would replace the locational standards now provided in City of Los Altos Resolution No. 2019-35, would be adopted by ordinance into Chapter 14.82 of the Los Altos Municipal Code. In addition, the City proposes to expand and supplement existing development standards and design guidelines and preferences for wireless telecommunications facilities contained in Resolution No. 2019-35 by (1) adding a set of basic design principles that would apply to all wireless telecommunications facilities and (2) identifying configuration preferences along with design guidelines for specific types of wireless facilities.

Contact Information

Name
Gabe Engeland
Agency Name
City of Los Altos
Job Title
City Manager
Contact Types
Lead/Public Agency

Location

Cities
Los Altos
Counties
Santa Clara
Regions
San Francisco Bay Area
Other Location Info
Citywide

Notice of Determination

Approving Agency
City of Los Altos
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
https://www.losaltosca.gov/citycouncil/page/small-cell-nodes AND 1 North San Antonio RD, Los Altos, CA 94022

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print