West Side Fire Station Project

3 Documents in Project

Summary

SCH Number
2022010326
Lead Agency
City of Beaumont
Document Title
West Side Fire Station Project
Document Type
NOD - Notice of Determination
Received
Posted
3/10/2022
Document Description
The City of Beaumont (City) is proposing a new fire station, storage building, parking area, new access roads, and landscaping along the eastern side of Potrero Boulevard in Beaumont, California. The Project would be located on approximately 1.59 acres spanning portions of three different parcels: APNs 414-120-040, -041, and -042 (Project site; Figure 1). The proposed fire station would be composed of two buildings, totaling approximately 10,760 square feet. One building would be located on the southwest corner of the Project site and one building would be located on the southeast corner of the site. A covered, concrete walkway would be constructed to connect the two structures. The southwestern building would be used for administrative and communal needs associated with the fire department staff, while the southeastern building would be used as an apparatus room, with space for two fire engines. The Project is intended to improve fire service response times for local residents, particularly on the western side of the City.

Contact Information

Name
Carole Kendrick
Agency Name
City of Beaumont
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Location

Cities
Beaumont
Counties
Riverside
Regions
Southern California
Cross Streets
Potrero Boulevard and State Route 60
Zip
92223
Total Acres
1.59
Parcel #
414-120-040, -041, and -042
State Highways
SR 60, I-10
Railways
Amtrak Sunset Limited
Schools
Three Ring Elementary School
Township
3S
Range
1W
Section
5

Notice of Determination

Approving Agency
City of Beaumont
Approving Agency Role
Lead Agency
Approved On
County Clerk
Riverside
Final Environmental Document Available at
https://www.beaumontca.gov/1125/Planning-Projects

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.