Project Description PD-S-2021-0006 Administrative Modification to construct a 37,324 square foot, one-story, industrial building with mezzanines. In accordance with Section 15063 of the California Environmental Quality Act (CEQA) Guidelines, an Initial Study for GPA-102/SP-S-7, AMD#27/Z-S-742/CUP-S-823 was conducted in 2019 to determine if the construction of two industrial buildings that total 31,124 square feet on a 2.87-acre parcel would have a significant impact on the environment. Based on the conclusions of the Initial Study, it was found that, with the inclusion of three mitigation measures, the project did not have the potential for a significant impact on the environment, and on August 26, 2019, the Mitigated Negative Declaration was adopted as part of the project approval. The adopted Initial Study and Mitigated Negative Declaration (MND) are attached to this report (refer to Exhibit 1). Additionally, the three mitigation measures are conditions of approval for the modified project. The Administrative Modification is a request to reconfigure the building and associated parking and to enhance the building’s design and architecture. The project area will not change, therefore, impacts to cultural resources and the existing mitigation measures will remain the same and will apply to the current project request. There are no new impacts from the modification, and no additional mitigation measures are required for the proposal. Section 15162 of the State CEQA Guidelines states that when an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR or Negative Declaration shall be prepared for that project when the lead agency can make certain findings based on substantial evidence. Therefore, based on the criteria contained in Section 15162 of the State CEQA Guidelines it is found: 1. That there have been no substantial changes proposed in the project which would require major revisions to the Mitigated Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. The proposed project is to modify the building design by increasing the total square footage from 31,124 to 37,324 (6,200 sq. ft.). The first floor will consist of 30,824 square feet, and the remaining 6,500 square feet will be utilized for the mezzanine floor area. The approved parking lot will be modified to provide nine additional parking spaces, which requires minor changes to the site plan. The changes will remain on the previously approved project area, so there are no new significant environmental effects or a substantial increase in the severity of previously identified significant effects resulting from the modification. Therefore, the proposed project would not require any revisions to the MND. 2. That no substantial changes have occurred with respect to the circumstances under which the project is undertaken which will require major revisions in the previous Mitigated Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. The existing land uses in the surrounding vicinity and within the project area have not undergone any substantial changes since they were described and analyzed in the original project Initial Study and MND, so there is no substantial increase in the severity of any previously identified environmental effects that would require revisions in the MND. The General Plan land use designations for the area have not been changed, and the MND anticipates buildout of the project vicinity in accordance with these General Plan land use designations in its analysis of cumulative land use impacts and project circumstances. Therefore, the circumstances under which the project is undertaken have not changed substantially, and no revisions to the previously adopted MND are required. 3. That no new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the Mitigated Negative Declaration was certified as complete has become available. The permit modification application does not include any new information, of substantial importance, regarding significant effects from development of the project that were not previously discussed, identified, and analyzed in the previously adopted MND. There has been no new information submitted that demonstrates that significant effects would occur that were not discussed in the MND and there has been no new information submitted to demonstrate that previously identified significant effects will be substantially more severe. The existing mitigation measures were found to be effective and feasible at the time of adoption of the MND, and there have been no substantial changes to the project or the project circumstances that would change the mitigation measures. Therefore, no new information that contradicts the analysis in the Initial Study and MND has become available since the MND was adopted by the City Council in August 2019. Therefore, based on compliance with the City ordinances and the proposed changes to the approved project design, all other environmental effects on the project will continue to not be significant. Therefore, in accordance with Section 15162 of the CEQA Guidelines, the adopted MND (Exhibit 1) still applies to the project, and there is no substantial evidence that the project as modified could have a potentially significant effect on the environment beyond what was previously analyzed. In that the adopted Initial Study and Mitigated Negative Declaration, continue to reflect the independent judgment and analysis of the City.

Contact Information

Name
Alexandra Clingman
Agency Name
City of Simi Valley
Job Title
Assistant Planner
Contact Types
Lead/Public Agency

Location

Cities
Simi Valley
Counties
Ventura
Regions
Citywide
Cross Streets
Cochran St. 1000 Feet W. of Caper Ln.
Zip
93063
Total Acres
2.87
Parcel #
615-0-180-195
State Highways
118
Railways
Southern Pacific Rail Road

Notice of Determination

Approving Agency
City of Simi Valley
Approving Agency Role
Lead Agency
Approved On
County Clerk
Ventura
Final Environmental Document Available at
2929 Tapo Canyon Road, Simi Valley, CA 93063

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]
Notice of Completion [NOC] Transmittal form
Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print