Nevada Irrigation District (NID) English Meadow Access Road Watercourse Crossings, Streambed Alteration Agreement No. 1600-2021-0025-R2
Summary
SCH Number
2022010054
Lead Agency
Nevada Irrigation District
Document Title
Nevada Irrigation District (NID) English Meadow Access Road Watercourse Crossings, Streambed Alteration Agreement No. 1600-2021-0025-R2
Document Type
NOD - Notice of Determination
Received
Posted
1/4/2022
Document Description
The projects are limited to the repair of eight watercourse crossings on approximately 1.5 miles of existing road to provide access for tracked and rubber-tired equipment to implement fuels reduction and meadow restoration within Nevada Irrigation District (NID) property. No vegetation will be removed as part of this project. this project is associated with the English Meadow Restoration Project in EPIMS Notification NEV- 24853.
Contact Information
Name
Kelsey Vella
Agency Name
Department of Fish and Wildlife
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Responsible Agency
Phone
Location
Counties
Nevada
Regions
Northern California
Other Location Info
The projects are located on unnamed tributaries adjacent to English Meadow to the
southeast of Jackson Meadows Reservoir and approximately 22 miles northwest of Truckee; Assessor’s Parcel Number 015-030-005; County of Nevada; Latitude: 39.459301, Longitude: -120.52534; Township 18N, Range 13E, Sections 4 and 5 of the English Mountain U.S. Geological Survey Quad Map.
Notice of Determination
Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Nevada
Final Environmental Document Available at
Mitigated Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.