Streambed Alteration Agreement 1600-2021-0089-R1 for H. Jones Nonindustrial Timber Management Plan 2-21NTMP-00005-SIS

Summary

SCH Number
2021120377
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement 1600-2021-0089-R1 for H. Jones Nonindustrial Timber Management Plan 2-21NTMP-00005-SIS
Document Type
NOD - Notice of Determination
Received
Posted
12/16/2021
Document Description
The Department of Fish and Wildlife is issuing an Agreement for replacement of two Class III native surfaced ford crossings with rocked ford crossings, replacement of one Class III existing temporary crossing with a rocked ford, construction of one new rocked ford on a Class II watercourse, construction of one new vented rock armored ford on a Class II watercourse, construction of one new in-stream drafting site on a spring fed Class II watercourse, and removal of debris at the inlet and outlet and possible culvert replacement at an existing Class II crossing.

Contact Information

Name
Merissa Hanisko
Agency Name
Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Name
Jonathan Woessner
Agency Name
CALFIRE
Job Title
Forester III
Contact Types
Lead/Public Agency

Location

Counties
Siskiyou
Township
45N
Range
3W
Section
10
Base
MDBM
Other Location Info
Also 46N, 3W, section 24

Notice of Determination

Approving Agency
CALFIRE
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Nonindustrial Timber Management Plan)
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print