Cazneaux Dock & Pier Replacement Project

Summary

SCH Number
2021120081
Public Agency
Lake County
Document Title
Cazneaux Dock & Pier Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/6/2021
Document Description
The project proposes to remove existing pier, gangway and swim platform. Construct a new 5’x 87’ (435 sq. ft.) pier, 3’ x 30’ (90 sq. ft.) gangway and 35’ x 28’ (980 sq. ft.) double boatlift. Project includes removing 12 wooden pilings and 2 metal pilings; and driving 17 new metal pilings. No littoral vegetation will be removed. Tules are present in the project area but will be avoided and therefore there will be no impacts to tules. The proposed structure will be moved north of the existing structure to avoid any impacts to the tules. All work in the lake will occur between October 15 and December 31. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA.

Contact Information

Name
Tracy Cline
Agency Name
County of Lake, Community Development Department
Job Title
Associate Resource Planner
Contact Types
Lead/Public Agency

Location

Cities
Kelseyville
Counties
Lake
Regions
Countywide
Parcel #
044-243-14

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Class 1 Existing Facilities - 15301 (d)
Reasons for Exemption
The project proposes to remove existing pier, gangway and swim platform and will remove 12 wooden pilings and 2 metal pilings. No littoral vegetation will be removed. Tules are present in the project area but will be avoided and therefore there will be no impacts to tules. The proposed structure will be moved north of the existing structure to avoid any impacts to the tules. All work in the lake will occur between October 15 and December 31. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA.

Exempt Status
Categorical Exemption
Type, Section or Code
Class 3 New Construction - 15303 (e)
Reasons for Exemption
The project proposes to construct a new 5’x 87’ (435 sq. ft.) pier, 3’ x 30’ (90 sq. ft.) gangway and 35’ x 28’ (980 sq. ft.) double boatlift and includes driving 17 new metal pilings. No littoral vegetation will be removed. Tules are present in the project area but will be avoided and therefore there will be no impacts to tules. The proposed structure will be moved north of the existing structure to avoid any impacts to the tules. All work in the lake will occur between October 15 and December 31. The project will not result in significant adverse environmental effects to wetlands or riparian habitats. The Lake County Community Development Department has determined that the project will not have a significant effect on the environment and is, therefore, exempt from the provisions of CEQA.
County Clerk
Lake

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.