Permit No. 19615 – Knights Landing Flood Management Project: Sacramento River, Mid-Valley Levee Reconstruction Sites 9 and 10.
4 Documents in Project
Summary
SCH Number
2021120063
Lead Agency
Yolo County
Document Title
Permit No. 19615 – Knights Landing Flood Management Project: Sacramento River, Mid-Valley Levee Reconstruction Sites 9 and 10.
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2022
Document Description
Approval of Permit No. 19615, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To reconstruct the levee crown and embankment along two sites on the right (west) bank of the Sacramento River near Knights Landing to address seepage. The through-seepage mitigation improvements include construction of two shallow cutoff walls along a total of 1,700 feet within the levee embankment.
Contact Information
Name
Jamie Silva
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Counties
Yolo
Regions
Northern California
Other Location Info
The project is located Sacramento River right bank levee would be conducted at Sites 9 and 10 between levee mile (LM) 2.66 and 3.22. The site boundaries include the levee prism to Yolo County Road (CR) 116B.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's administrative record related to the approval of this encroachment permit is available for public review at the Central Valley Flood Protection Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.