Rockport Culverts Project

2 Documents in Project

Summary

SCH Number
2021110418
Lead Agency
California Department of Transportation, District 1 (DOT)
Document Title
Rockport Culverts Project
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2022
Document Description
Caltrans proposes to rehabilitate or replace five culvert systems on Route 1 from post mile (PM) 85.09 to 88.95 near Rockport from 1.3 miles north of the Hardy Creek Bridge to 1.1 miles south of the Cottoneva Creek Bridge . The purpose of this is to improve drainage systems and reduce erosion to protect the structural integrity of SR 1.The project is needed because the culverts are severely damaged or have failed, resulting in insufficient drainage capacity causing roadway flooding and embankment erosion which could potentially lead to roadway failure.

Contact Information

Name
Amanda Lee
Agency Name
Caltrans District 1
Job Title
Associate Environmental Planner
Contact Types
Lead/Public Agency

Location

Cities
Rockport
Counties
Mendocino
Regions
Northern California
Cross Streets
State Route 1 from post mile (PM) 85.09 to 88.95
Parcel #
Multiple
State Highways
SR 1
Railways
N/A
Airports
N/A
Schools
N/A
Waterways
Cottaneva Creek, Rockport Creek, Hardy Creek
Other Location Info
Five locations on SR 1 from post mile (PM) 85.09 to 88.95 near Rockport. Approximately 1.3 miles north of the Hardy Creek Bridge to 1.1 miles south of the Cottoneva Creek Bridge.

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On
County Clerk
Mendocino
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-3/d3-programs/d3-environmental/d3-environmental-docs/d3-mendocino-county

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print