JobTrain Office Project

3 Documents in Project

Summary

SCH Number
2021110199
Lead Agency
City of East Palo Alto
Document Title
JobTrain Office Project
Document Type
NOD - Notice of Determination
Received
Posted
1/28/2022
Document Description
The project would demolish the existing on-site buildings, improvements, and parking associated with the existing industrial use and redevelop the site with one new four-story, approximately 110,000-square-foot office building, surface parking lot, and landscaping. The proposed office building would be constructed along Pulgas Avenue, and the surface parking lot would be located behind the office building. The new office building would have a maximum height of 78-feet (including mechanical screening) with approximately 55,000 square feet being used for JobTrain for a nonprofit office and approximately 55,000 square feet being used by Emerson Collective as general office space. The first floor of the proposed building would feature approximately 10,500 square feet of ground floor open space for a carpentry yard and a children’s play area. Project construction would include removal of the existing parking lot improvements and landscaping, excavation for building footings and construction of the office building

Contact Information

Name
Elena Lee
Agency Name
City of East Palo Alto
Job Title
Planning Manager
Contact Types
Lead/Public Agency

Location

Cities
East Palo Alto
Counties
San Mateo
Regions
Citywide
Cross Streets
Bay Street
Zip
94303
Total Acres
3.86
Jobs
440
Parcel #
063-131-370
Airports
Palo Alto Airport

Notice of Determination

Approving Agency
City of East Palo Alto
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Mateo
Final Environmental Document Available at
https://www.cityofepa.org/planning/project/jobtrain-office-project

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print