Washington Avenue Well Project

2 Documents in Project

Summary

SCH Number
2021110169
Lead Agency
City of Santa Ana
Document Title
Washington Avenue Well Project
Document Type
NOD - Notice of Determination
Received
Posted
2/17/2022
Document Description
The 2017 Santa Ana Water Master Plan (Tetra Tech 2018) water system analysis identified low pressure deficiencies in the northeastern portion of the Low Zone on the south side of Interstate 5 between East 17th Street and East 1st Street. To resolve these low pressure deficiencies, the City is proposing to install a new water supply well in the vacant lot at 651-657 East Washington Avenue at the northwest corner of East Washington Avenue and Penn Way. The Project includes construction of approximately 140 feet of new pipeline to connect the new well to the existing water supply pipeline in Penn Way. The Project also includes a well pump building, a chemical facility building (for onsite generation of sodium hypochlorite to disinfect well production waters), four material storage bins, an 8-foot tall perimeter block wall, and landscaping.

Contact Information

Name
Armando Fernadez
Agency Name
CIty of Santa Ana
Job Title
Sr. Civil Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Santa Ana
Counties
Orange
Regions
Citywide
Cross Streets
East Washington Avenue and Penn Way
Zip
92701
Total Acres
0.75
State Highways
Interstate 5
Railways
Southern Pacific
Schools
Davis Elementary

Notice of Determination

Approving Agency
City of Santa Ana
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
220 S. Daisy Avenue, Santa Ana, CA 92701

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.