The Cove at El Niguel

4 Documents in Project

Summary

SCH Number
2021110122
Lead Agency
City of Laguna Niguel
Document Title
The Cove at El Niguel
Document Type
NOD - Notice of Determination
Received
Posted
9/19/2022
Document Description
The Project proposes the redevelopment of the property, which previously contained 41 homes demolished following the Via Estoril Landslide in March 1998. The proposed Project will result in the construction of 22 three-story condominium style homes configured in 6 triplex and 2 duplex buildings on approximately 2 acres of the site, and approximately 2.2 acres of open space. The 4.2-acre Project site is designated as APN 656-321-02. The property will be subdivided into two lots, Lot 1 and Lot “A”. Lot 1 includes the 2-acre residential area and Lot “A” includes the 2.2-acre area of open space. The Project is consistent with the existing Residential Attached General Plan Land Use designation and the existing Multi-Family (RM) Zoning for the site.

Contact Information

Name
Amber Gregg
Agency Name
City of Laguna Niguel Contract Planner
Job Title
Contract Planner
Contact Types
Lead/Public Agency

Location

Cities
Laguna Niguel
Counties
Orange
Regions
Citywide
Cross Streets
Crown Valley Parkway and Alicia Parkway
Zip
92677
Total Acres
4.2 acres
Parcel #
656-321-02
State Highways
Pacific Coast Highway
Waterways
Pacific Ocean
Township
7S
Range
8W
Base
SBBM

Notice of Determination

Approving Agency
City of Laguna Niguel
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
City of Laguna Niguel Community Development Department 30111 Crown Valley Parkway Laguna Niguel, CA 92677

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print