State Street Village Project
2 Documents in Project
Summary
SCH Number
2021110117
Lead Agency
City of Redlands
Document Title
State Street Village Project
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2022
Document Description
The Project is a proposed mixed-use development known as the State Street Village (Project; proposed Project). The Project site is comprised of multiple parcels bordered by a public alleyway, Orange Street, Redlands Boulevard, and Eureka Street. Three commercial buildings (Redlands Mall) and surface parking lots are currently located on the Project site. The Project would demolish the existing structures to construct the Project. The Project proposes to demolish the existing building and the development of six 3- to 4-story mixed-use buildings consisting of 700 multifamily dwelling units, 71,778 square feet (SF) of ground-floor retail, 12,328 SF of office space, amenity areas, community building, and a 1,721 SF rooftop restaurant space with a rooftop deck. A 14,500 SF drugstore with drive through and surface parking lot is proposed for the area south of Citrus Avenue. The Project would construct an approximately 460-foot extension of West State Street (west of Orange Street) to connect to a new 545-foot extension of Third Street through the Project site. The Project would include 2 subterranean, single-level parking garages and a 6-level parking garage for a total of approximately 1,167 parking spaces. The Project would include a new pedestrian plaza totaling approximately 22,000 SF on Third Street.
Contact Information
Name
Brian Foote
Agency Name
City of Redlands
Job Title
Planning Manager
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Redlands
Counties
San Bernardino
Regions
Citywide
Cross Streets
Redlands Boulevard, Eureka Street, Citrus Avenue, Orange Street
Zip
92373
Total Acres
12.25
Jobs
728
Parcel #
0171-053-01;0171-251-06;0171-053-02;0171-251-07;0171-053-03;0171-251-08;0171-053-04;0171-251-09
State Highways
I-10
Railways
SBCTA Arrow Line
Schools
University of Redlands, Redlands High School
Waterways
Santa Ana River
Township
1S
Range
3W
Section
27
Base
Redlands
Other Location Info
The project proposes to redevelop the 11.15-acre Redlands Mall site at the southwest corner of Redlands Boulevard and Orange Street (APNs: 0171-053-01, 0171-053-02, 0171-053-03, 0171-053-04, 0171-053-05, and 0171-053-06) and the 1.1-acre parking lot located at the southeast corner of Citrus Avenue and Eureka Street (APNs: 0171-251-06, 0171-251-07, 0171-251-08, 0171-251-09, and 0171-251-10).
Notice of Determination
Approving Agency
City Council of the City of Redlands
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Bernardino
Final Environmental Document Available at
City of Redlands Development Services Department, Planning Division Office, 35 Cajon Street, Suite 20, Redlands, CA 92373
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Sustainable Communities Environmental Assessment)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.