Yolo Bypass East Levee Reach

2 Documents in Project

Summary

SCH Number
2021110114
Lead Agency
West Sacramento Area Flood Control Agency
Document Title
Yolo Bypass East Levee Reach
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2021
Document Description
The U.S. Army Corps of Engineers and WSAFCA within specific segments of the YBEL propose to install stability berms (AA), reconstruct levee maintenance roads (AA), replenish waterside revetment (AC to Z), and improve the levee drainage system through extension of the underground seepage collection system and installation of an new pump station (segment AD) to discharge flood water back to the Yolo Bypass.

Contact Information

Name
Greg Fabun
Agency Name
West Sacramento Area Flood Control Agency
Job Title
General Manager
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Regions
Northern California
Cross Streets
Channel and Enterprise
Zip
95691
Total Acres
15
State Highways
California
Railways
UPRR
Airports
None
Schools
Western Truck School
Waterways
Yolo Bypass, Sacramento River, Deep Water Ship Channel

Notice of Determination

Approving Agency
West Sacramento Area Flood Control Agency, Board of Directors
Approving Agency Role
Lead Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
https://www.cityofwestsacramento.org/government/departments/city-manager-s-office/flood-protection/levee-projects-overview

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print