Woodside Avenue Sidewalk Improvement Project

2 Documents in Project

Summary

SCH Number
2021110082
Lead Agency
San Diego County
Document Title
Woodside Avenue Sidewalk Improvement Project
Document Type
MND - Mitigated Negative Declaration
Received
Document Description
The project proposes to enhance pedestrian, motorist and bicyclist safety by installing sidewalk, traffic signal improvements, striping modifications, Class II bike lane and buffered bike lanes along Woodside Avenue between Marilla Drive and Chestnut Avenue where feasible. Gaps in sidewalk and bike lane continuity will be addressed on both sides of Woodside Avenue by joining existing sidewalks, updating curb ramps to ADA compliance, and making modifications to traffic signals and striping. Bicycle buffers, accessible bus stops, crosswalk improvements, ADA compliant sidewalk and pedestrian ramps will be utilized where possible to enhance pedestrian and traffic safety. New sidewalk construction involves 1,150 feet of new sidewalk connectivity between southside Marilla Dr. and Riverview Ave. 1,250 feet of new sidewalk connectivity along the northside between Riverview Ave. to Winter Gardens Blvd. and 500 feet of new construction along the southside and continuing down Winter Gardens Blvd, 1,675 feet of new sidewalk connectivity between Winter Gardens Blvd. and Channel Rd. along the northside and 1,600 feet of connectivity along the southside, and 700 feet of new sidewalk connectivity along the northside of Channel Rd. to Cactus St., and 700 feet of southside new construction along Channel Rd.to Cactus St. Sidewalk improvements continue from Cactus St to Chestnut 600 feet along the north side and 350 feet on the south side. Construction is anticipated to last approximately 12-18 months.

Contact Information

Name
Thomas Duffy
Agency Name
County of San Diego, Department of Public Works
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Woodside Avenue and Wintergardens Boulevard
Township
15S
Range
1W
Section
55
Base
144&145

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Air Resources Board (ARB), California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Department of Water Resources (DWR), California Highway Patrol (CHP), California Native American Heritage Commission (NAHC), California Natural Resources Agency, California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California San Diego River Conservancy (SDRC), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, State Water Resources Control Board, Division of Water Quality
Development Types
Transportation:Local Road (Woodside Ave sidewalk and bike lanes improvements)
Local Actions
sidewalk and traffic signal improvements, and bike lanes and buffered bike lanes installation
Project Issues
Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Tribal Cultural Resources

Attachments

Notice of Completion [NOC] Transmittal form

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print