State Route 37 Flood Reduction Project

6 Documents in Project

Summary

SCH Number
2021110045
Lead Agency
California Department of Transportation, District 4 (DOT)
Document Title
State Route 37 Flood Reduction Project
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2024
Document Description
Construct a causeway that would be 35 feet in elevation, consisting of four 12-foot-wide lanes, a 22-foot-wide median with a 2-foot-wide median barrier, two 10-foot-wide inside shoulders, two 12-foot-wide outside shoulders, two 2-foot-wide outside barriers, and a barrier-separated 14-foot-wide bicycle or pedestrian path with a 2-foot-wide barrier, for a total roadway width of 114 feet. The project would also replace the Novato Creek Bridge. The project would reduce flooding and improve resiliency toward Year 2130 sea level rise and stormwater overtopping onto SR 37.

Contact Information

Name
Cherry Zamora
Agency Name
California Transportation Commission
Job Title
Associate Deputy Director
Contact Types
Responsible Agency

Location

Counties
Marin
Regions
Northern California, San Francisco Bay Area
State Highways
State Route 37
Other Location Info
State Route (SR) 37 from postmile (PM) R11.2 to PM 13.8, in Marin County.

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
Caltrans District 4, 111 Grand Avenue, Oakland, CA 94612

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print