State Route 37 Flood Reduction Project

6 Documents in Project

Summary

SCH Number
2021110045
Lead Agency
California Department of Transportation, District 4 (DOT)
Document Title
State Route 37 Flood Reduction Project
Document Type
NOD - Notice of Determination
Received
Posted
2/5/2024
Document Description
The purpose of the Project is to build resiliency to the effects of projected 2130 sea level rise (SLR) and stormwater overtopping onto SR 37 from Post Mile (PM) PM R11.2 to PM 13.8 in Marin County. The Project proposes a causeway that would be 35 feet in elevation and consist of four 12-foot-wide lanes, a 22-foot-wide median with a 2-foot-wide median barrier, two 10 foot-wide inside shoulders, two 12-foot-wide outside shoulders, two 2-foot-wide outside barriers, and a barrier-separated 14-foot-wide bicycle or pedestrian path with a 2-foot-wide barrier, for a total roadway width of 114 feet. The Project does not propose tolling or long-term vehicular capacity increase on SR 37.

Contact Information

Name
Maxwell Lammert
Agency Name
California Department of Transportation District 4
Job Title
Acting Office Chief
Contact Types
Lead/Public Agency

Location

Cities
Novato
Counties
Marin
Regions
Northern California, San Francisco Bay Area
Cross Streets
Atherton Avenue, Hanna Ranch Rd, Marsh Rd, US 101
Zip
94945
Total Acres
188.2
State Highways
SR 37
Railways
Sonoma-Marin Area Rail Transit
Airports
Hamilton Ignacio Terminal
Schools
Olive Elementary, Lorna Verde Elementary
Waterways
Novato Creek, Simonds Slough, San Pablo Bay, Petaluma River

Notice of Determination

Approving Agency
California Department of Transportation District 4
Approving Agency Role
Lead Agency
Approved On
County Clerk
Marin
Final Environmental Document Available at
https://dot.ca.gov/caltrans-near-me/district-4/d4-popular-links/d4-environmental-docs

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print