Big Sandy Rancheria Wastewater System Improvements Project
3 Documents in Project
Summary
SCH Number
2021100580
Lead Agency
State Water Resources Control Board, Divison of Financial Assistance
Document Title
Big Sandy Rancheria Wastewater System Improvements Project
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2024
Document Description
The State Water Resources Control Board (State Water Board) is the Lead Agency for the Project. The Project involves the construction and operation of a new wastewater treatment plant (WWTP) and associated wastewater collection system within the Big Sandy Rancheria (BSR). The project site consists of the area in which the following components would be located: the proposed WWTP site; proposed wastewater collection pipelines and two lift stations that would accommodate 57 service connections; abandonment of 56 existing septic systems; and electrical improvements to facilitate the new components.
Contact Information
Name
Brian Cary
Agency Name
State Water Resource Control Boards Division of Financial Assistance
Job Title
Senior Environmental Scientist
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Auberry
Counties
Fresno
Regions
Unincorporated
Cross Streets
Auberry Mission Road, Jose Basin Road
Zip
93602
State Highways
SR 168
Waterways
Backbone Creek
Township
10S
Range
23E
Section
04
Base
MDM
Notice of Determination
Approving Agency
State Water Resource Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.