Streambed Alteration Agreement No. 1600-2021-0074-R1 “Panther” Timber Harvesting Plan (THP) 2-21-00109-SIS

Summary

SCH Number
2021100506
Lead Agency
California Department of Forestry and Fire Protection (CAL FIRE)
Document Title
Streambed Alteration Agreement No. 1600-2021-0074-R1 “Panther” Timber Harvesting Plan (THP) 2-21-00109-SIS
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2021
Document Description
The project is limited to two encroachments including water drafting from two existing in stream drafting sites located on a Class I and a Class II watercourse, as described in the THP on pages 31 through 34 of the THP. The locations of the water drafting sites are shown on page 50-5 of the THP

Contact Information

Name
Nicholas Simpson
Agency Name
Fish And Wildlife
Contact Types
Responsible Agency

Name
Jon Ramaley
Agency Name
CALFIRE
Contact Types
Lead/Public Agency

Location

Cities
Mount Shasta
Counties
Siskiyou
Regions
Northern California
Township
47N
Range
03W
Section
24
Base
Mt Diabl

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Siskiyou
Final Environmental Document Available at
The final EIR, Negative Declaration, or THP that was prepared by the Lead Agency for this project is available to the General Public at the office location listed above for the Lead Agency. CDFW’s CEQA Findings are available at the CDFW office identified above.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Timber Harvesting Plan)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print